Ice machine operating instructions (iv)

Source: Time:2016-04-22 11:01:38 views:

Ice machine must be checked before starting the automatic water supply device is normal, water storage tank is reasonable, Andre ice machine at the factory adjusted exactly level, the user may make alignment Then plug in the power, the pump starts running 1.5 minutes after the ice fall.
[Operation Ice]


(1) must be checked before starting the automatic water supply device is normal, water storage tanks are reasonable (this unit is factory adjusted exactly level, the user may make alignment).

(2) plugged in, ice machine began to work, the first pump starts running (pump with an exhaust air process a short time) for about 2 minutes after the compressor is started, the state machine into the ice.

(3) When the thickness of the ice thickness reaches the set, ice plate probe started, the solenoid valve to work, the pump stops working, the hot gas into the evaporator, about 1.5 minutes the ice fall. When the ice fall, so that the tailgate off the ice and flipped open the reed switch. When the reed switch is closed again, the machine into the ice making process again.

(4) compressor ice and off the ice throughout the process does not stop.

(5) within the reservoir when the ice bucket full of ice, magnetic reed switch can not be closed automatically, the machine automatically stops working when removed enough ice, after the reed switch is closed again, the machine starts delayed after 3 minutes, re-enter the system ice process.



[Ice bridge thickness adjustment]


Thickness (1) ice bridge should be about 3mm, interpersonal and evaporator probe should be increased ice bridge thickness than the actual ice bridge thickness is about 1.5mm thick, clockwise rotation of the adjustment screw mouth (screw rotating 1/3 turn ice bridge thickness change 1.5mm).

(2) Inspect the probe wiring board and connecting brackets, should ensure that each is free to rotate after the freeze cycle can be returned to the correct position.


keys: 

latest cases


Home  |  Into Andeli  |  All Products  |  Project Cases  |  Solutions  |  News  |  Service Center  |  Contact Us  |  Website Map  |  Member  | 
Advanced Search:

Copyright@2011-2016 ADL1688.com Guangdong Andeli Refrigeration Equipment Co. Ltd GDICPprepare 2021106294号


Switchboard:

400-877-3588

Company Fax:

86+020-37419847